Jump to content

Staging / Parking Areas for St. Clements Area Trails


Recommended Posts

You may or may not know that the St. Clements Snowmobile Clubhouse and property was recently sold. Unfortunately the new owner will no longer be allowing snowmobiles or Staging / Parking on the property. If you are looking for a place to Stage / Park while riding the St. Clements area trails we have arranged permission for riders to Stage / Park at the Waterloo Rod and Gun Club as well as at the Linwood Community Centre. Both of these locations are located very close to the trail for easy access. Please refer to the Interactive Trail Guide for the locations of these parking areas. The trail 5-72 has been rerouted behind the old Clubhouse and will still allow riders access to the St. Clements area trails as usual. The ITG will be updated shortly showing the reroute. A BIG THANK YOU to our Valuable Landowners for allowing us to reroute the trail on their properties.

  • Like 6
Link to comment
Share on other sites

10 hours ago, Bearnecessities said:

You may or may not know that the St. Clements Snowmobile Clubhouse and property was recently sold. Unfortunately the new owner will no longer be allowing snowmobiles or Staging / Parking on the property. If you are looking for a place to Stage / Park while riding the St. Clements area trails we have arranged permission for riders to Stage / Park at the Waterloo Rod and Gun Club as well as at the Linwood Community Centre. Both of these locations are located very close to the trail for easy access. Please refer to the Interactive Trail Guide for the locations of these parking areas. The trail 5-72 has been rerouted behind the old Clubhouse and will still allow riders access to the St. Clements area trails as usual. The ITG will be updated shortly showing the reroute. A BIG THANK YOU to our Valuable Landowners for allowing us to reroute the trail on their properties.

A big Thank You to Bearnecessities who spent many many hours dealing with Landowners, Grand River Conservation Authority and most days during prep and construction at the site of the low level bridge replacement without which  the re route would not have been possible. A big Thank You to our club president Reiner who's relationship with the farmers and landowners really helped this project along.

  • Like 3
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...