Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 09/15/2019 in all areas

  1. Fill it with logs and brush on the first trip with the groomer. That method is a staple up here.
    1 point
  2. Probably quicker in that instance.
    1 point
  3. The pic doesn’t show but the washout is 12 ft deep and 20 ft wide and 30 ft in length ,just putting in the new culvert and all the fill in this area will be a task in itself ,I’m sure the MNR will drag their feet and not help out the clubs what so ever
    0 points
  4. If MNR is involved that washout will be there this sled season I'm afraid and no way around it
    0 points
×
×
  • Create New...